Activity Recording

This section is available only for editions higher than PQFORCE Smart

Workspace

The workspace features a table that visually represents employees' work activities, allowing for the logging of daily work hours and tracking of time allocation across different projects and tasks.

It comprises several columns and rows, each providing specific information about allocated time, actual efforts, absences, and project activities.

1 ALLOCATED: Represents the predetermined hours that an employee must dedicate to his projects over a specified period.

2 ACTUAL EFFORT: Displays the actual time spent by the employee on each assigned project or task.

3 ABSENCES AND SHIFTS:

  • Divides days into morning and afternoon shifts, allowing customization of working schedules according to individual or organizational requirements.

  • Allows to designate certain days as absences, such as holidays or sick leaves, for either one shift or the entire day.

4 TARGET TIME: Indicates the total hours an employee is expected to work during the indicated month, as per the company's schedule.

5 ABSENCES: Displays the number of hours an employee was absent during the month.

6 PRESENCE: Shows the number of hours an employee dedicated to work throughout the month, based on recorded hours.

7 Σ PRESENCE AND ABSENCE: Provides insights into the hours already dedicated to work and how many working hours are remaining until the end of the month.In the Presence and Presence and Absence rows, presence can be recorded in two ways:

  • Expected Presence: The presence assumed by the system for a given period. Displayed in light gray, it serves as a placeholder until the user registers their actual presence.

  • Effective Presence: The presence recorded directly by the user, either via clock in/clock out or by manually entering presence times, displayed in black. Please note that recording effective presence removes all expected presence placeholders set for days prior to the recording date.

8 Σ PROJECT ACTIVITY: Presents the total hours an employee has dedicated to all their projects so far. Projects will appear in this section regardless of their lifecycle status. After task-level actuals have been recorded, a small red clock icon appears on the corresponding project row. Double-clicking it expands the project to display its tasks alongside the actuals allocated to each of them.

The Activity Recording view offers two primary functionalities: registering presence and project activity recording.

Registering presence

In PQFORCE, registering presence involves tracking and recording employees' presence for work within predefined time frames:

  • Clocking In: Employees begin their work shift by logging in to the system, indicating their presence.

  • Clocking Out: At the end of their shift, employees log out of the system, signifying the conclusion of their work period.

This feature enables to maintain precise records of employee attendance and absences, facilitating effective workforce management and productivity optimization.

PQFORCE offers two methods for employees to register the working presence:

Clock in/ Clock out

  • Access the User Menu.

  • Within the menu, select "Clock in" to start registering the working presence.

  • To conclude the recording, select "Clock out" from the same menu.

  • This method allows for multiple registrations in a day, allowing for breaks and resuming work during the working day

Manually record presence

  • Navigate to the "Activity Recording" view.

  • Within the table, select the desired date for which the working presence must be recorded. Manually input the precise time slots indicating the start and end times of the working shift. The system automatically calculates the total hours worked, based on the registered data for each day.

  • A pencil shaped icon will appear next to each time slot inserted manually

Recording absences

  • Navigate to the Activity Recording view

  • Locate ABSENCES AND SHIFTS line within the table. Click the box icon under a specific date.

  • In a pop-up window, select the reason for absence and leave a voluntary comment Clicking OK to confirm the absence.

  • Selecting multiple boxes at once enables the entry of several identical absences with the same type and comment.

Recording project activity

In PQFORCE, project activity recording allows employees to input the precise time slots for each activity assigned to them, indicating the number of hours or minutes spent on individual task and project.

It is possible to record the working activity by following these steps:

  • Access the Activity Recording view

  • Locate the date for which the activity needs to be recorded (this can be the current working day or any other day within the calendar).

  • From the list of available projects and tasks, locate the project to which the working hours will be allocated.

  • Input the precise number of hours worked under the selected date column and the corresponding project line.

  • If the total recorded time exceeds 24 hours, it will be highlighted in red. If it exceeds the allocated presence time, it will be shown in orange. In all other cases, the time will appear in black. If no presence has been recorded for the day, the system will instead display the expected presence time, which is shown in grey.

Options Area

The following section describes in detail which settings can be made in the Options Area.

1 TIME PERIOD

This section allows to designate a specific time frame for visualizing activity recording.

The oval-shaped icon, indicating the month and year, facilitates the selection of desired temporal parameters.

It is possible to navigate through different months by clicking the arrow circle icons positioned on the left and right sides of the month.

2 VIEW

Within this segment, it is possible to personalize the visualization of the primary table in the workspace.

Presence and Activity Recording icon renders the main activity recording table visible.

  • Activity Recording List View presents an alternative table format in which each row represents a day of the month. For each day, tasks assigned to the active employee can be recorded, with the hours spent distributed across the corresponding entries. A comment field is available for each individual entry, allowing notes to be added at the row level. Unlike the default Presence and Activity Recording table view, where entries for the same task are shown as cumulated values, the list view displays each entry individually, one per row. Multiple entries can be added for the same task on the same day, each with a different timestamp and comment. Additional entries can be added by clicking the + icon and selecting a project and, optionally, a task. Any entries added here are automatically reflected in the Presence and Activity Recording view.

  • Calendar opens a secondary workspace showcasing the availability of the active employee. Absences can be entered here and are reflected in the Absences row of the Presence and Activity Recording view. Scrolling to the far right of the Calendar view reveals a summary table showing public holidays from the configured Holiday Locales and the programmed absences entered by the user.

3 DURATION

This section offers users two options for adjusting the format of time visualization within the table:

  • The H:MM option displays time in hours and minutes.

  • The H:DD option displays time in decimal hours.

4 PROJECTS

This section offers filtering possibilities for the area of the workspace where project actuals can be recorded:

  • Show All Projects: Show all projects available in the system.

  • Show Only Allocated Projects: Show only projects assigned to the active employee for the selected time period.

  • Show Only Allocated Projects and Tasks: Show only projects and tasks assigned to the active employee within the selected time period (a dropdown allows the selection of the current month, or a range of plus/minus three or six months around it).

5 ACTIONS

The export icon allows data to be exported in the following formats:

  • Excel Form (Activity Recording): an employee-level report detailing the tasks worked on and the time recorded against each.

↑

Notification

Portal tour

A guided tour walks you through the page step by step, highlighting one control at a time and explaining what it does. You can stop at any point and pick up later.