Project Controlling
This section is available only for editions higher than PQFORCE Smart
The Project Controlling view provides a detailed breakdown of planned, recorded, and remaining efforts across the work breakdown structure of the selected project. In editions higher than PQFORCE Professional, a cost overview is also available across the same parameters.
Workspace
The workspace of this view can be displayed in two ways:
Show table view: The default display for this view. It presents planned, actual, and actual + provisional values in a table focused on the project.
Activity recording in list view: By clicking on this icon, a table with a list of days is showed. For each day, it’s possible to see the actuals registered by every resource on the tasks they have been assigned to. The focus is on the resources and their time spent on tasks.
Table view

In the workspace of this view there is a table in which the rows correspond to the elements of the work breakdown structure of the active project, while the columns correspond to PLAN/ACTUAL/REMAINING values.
In the workspace, the work breakdown structure of the active project, originating from the Planning view, is displayed in the TASKS column. In PQFORCE Professional, these values reflect effort only. In higher editions, cost values are also included. The work breakdown structure cannot be edited in this view.
The setting next to the column name determines the level of detail of the work breakdown structure. By clicking on one of the numbered boxes, all structural elements up to and including the corresponding task level are displayed.
Activity Recording in list view

In the workspace of this view each row in the table corresponds to a day in the project and can be collapsed or expanded. Each day row contains the list of resources allocated to the project along with the tasks they have recorded. The columns display the actual effort a resource spent on a given task, as well as an optional comment. Hovering with the mouse over the graph icon in the last column opens an overview comparing the planned effort for the selected resource against the actual effort recorded.
Options area
The following section describes in detail which settings can be made in the options area.
VIEW
The features of this section may differ depending on your PQFORCE edition.
COLUMNS
The features of this section may differ depending on your PQFORCE edition.
TIME PERIOD

Sets the reference period used in the corresponding comparison column of the table.
ACTIONS
This section is available only for editions higher than PQFORCE Professional
Provides options to export the view in multiple formats.