Project Controlling

This section is available only for editions higher than PQFORCE Smart

The Project Controlling view provides a detailed breakdown of planned, recorded, and remaining efforts across the work breakdown structure of the selected project. In editions higher than PQFORCE Professional, a cost overview is also available across the same parameters.

Workspace

The workspace of this view can be displayed in two ways:

  1. Show table view: The default display for this view. It presents planned, actual, and actual + provisional values in a table focused on the project.

  2. Activity recording in list view: By clicking on this icon, a table with a list of days is showed. For each day, it’s possible to see the actuals registered by every resource on the tasks they have been assigned to. The focus is on the resources and their time spent on tasks.

Table view

In the workspace of this view there is a table in which the rows correspond to the elements of the work breakdown structure of the active project, while the columns correspond to PLAN/ACTUAL/REMAINING values.

In the workspace, the work breakdown structure of the active project, originating from the Planning view, is displayed in the TASKS column. In PQFORCE Professional, these values reflect effort only. In higher editions, cost values are also included. The work breakdown structure cannot be edited in this view.
The setting next to the column name determines the level of detail of the work breakdown structure. By clicking on one of the numbered boxes, all structural elements up to and including the corresponding task level are displayed.

Activity Recording in list view

In the workspace of this view each row in the table corresponds to a day in the project and can be collapsed or expanded. Each day row contains the list of resources allocated to the project along with the tasks they have recorded. The columns display the actual effort a resource spent on a given task, as well as an optional comment. Hovering with the mouse over the graph icon in the last column opens an overview comparing the planned effort for the selected resource against the actual effort recorded.

Options area

The following section describes in detail which settings can be made in the options area.

VIEW

The features of this section may differ depending on your PQFORCE edition.

  • Show table view: Switches to the table described above in the workspace. If this view is active, check boxes appear to the right of this button, which can be used to select the columns displayed in the workspace. The following options are available:

    • Groups: Contains attributes from the Planning view and actuals recorded by employees.

    • Columns: Contains the option to show effort and allocation.

  • Activity recording in list view: Switches to the table described above in the workspace

  • Show table view: Switches to the table described above in the workspace. If this view is active, check boxes appear to the right of this button, which can be used to select the columns displayed in the workspace. The following options are available:

    • Groups: Contains attributes from the Planning view and actuals recorded by employees.

    • Columns: Contains the option to show effort and allocation.

  • Activity recording in list view: Switches to the table described above in the workspace

  • Currency: This section allows changing the currency used for cost-related values in the table.

COLUMNS

The features of this section may differ depending on your PQFORCE edition.

  • Groups

    • Entire project: Shows or hides the workspace columns to include planned efforts from the Planning view, actual efforts recorded by allocated resources, and actual + provisional efforts.

    • Selected time period: Shows or hides the workspace columns to data from the month selected in the Time Period section.

  • Columns

    • Effort: Shows or hides the workspace columns to show efforts or allocations.

  • Groups

    • Entire project: Shows or hides the workspace columns to include planned efforts from the Planning view, actual efforts recorded by allocated resources, and actual + provisional efforts. In addition, the workspace can show the allocated budget for the project, as well as the planned, actual and remaining costs.

    • Selected month: Shows or hides the workspace columns to data from the month selected in the Time Period section.

  • Columns

    • Effort: Shows or hides the workspace columns to show efforts or allocations.

    • Costs: Shows or hides the workspace columns to show costs.

TIME PERIOD

Sets the reference period used in the corresponding comparison column of the table.

ACTIONS

This section is available only for editions higher than PQFORCE Professional

Provides options to export the view in multiple formats.

↑

Notification

Portal tour

A guided tour walks you through the page step by step, highlighting one control at a time and explaining what it does. You can stop at any point and pick up later.