Gantt

This view offers a comprehensive display of all Gantt plans derived from the respective PLANNING views of individual projects within the overall active project list. Within higher editions than PQFORCE Smart, it serves as the hub for creating and managing global milestones.

Workspace

In the PROJECTS view workspace, all projects contained in the PPM module are displayed in the form of a Work Breakdown Structure, a hierarchical decomposition of the work needed to complete a project into smaller, more manageable components, accompanied by an associated Gantt chart.

The Gantt chart at the project list level features the following hierarchical elements:

  • Bars representing the projects.

  • Bars representing the tasks of individual projects.

  • Diamonds representing the milestones of individual projects.

  • Black lines representing the folders created within individual projects.

To learn how to use and manipulate the Gantt chart in PQFORCE, please refer to the project's PLANNING view article.

The only exception is the management of global milestones, available only for editions higher than PQFORCE Smart.

Manage global milestones

This feature is available only for editions higher than PQFORCE Smart.

Global milestones are milestones maintained at the project list level, positioned at the top of the work breakdown structure. A new global milestone can be created using the plus button.

Once created, this global milestone is visible within each project contained in the active project list, yet any modifications or deletions must be executed solely at the project list level. The dependencies of global milestones to tasks and milestones are also displayed in the corresponding project PLANNING view. If such dependencies exist, they are presented on the GANTT view of the overall project list.

Historical Planning

The Historical Planning feature allows comparing the current Gantt chart against its state on any past date. It is accessed by clicking the clock icon in the top-left corner of the Gantt chart.

A comparison date is selected by clicking the corresponding day on the timeline. Global milestones are displayed on the timeline, and the green indicator marks the current date, while the grey indicator marks the selected comparison date.

The “Show/Hide Layers” slider controls the visual overlay between the current and historical Gantt views. Dragging the slider toward Current increases the visibility of the present state, while dragging it toward Historical brings the past state to the foreground.

The Historical Planning panel can be repositioned by clicking and dragging it from its top area

Options Area

The following section describes in detail which settings can be applied in the Options Area.

FILTER

These check boxes influence the information displayed in the workspace.

Project status: These checkboxes can be used to determine which projects are displayed, depending on their Lifecycle status.

RESOURCES

Adds resource planning capabilities to the view.

Plan resources

The functionalities and availability of this section may vary depending on your PQFORCE edition.

This section opens in the secondary workspace a listing of the resources from the organisation chart and their workload diagrams.

The left part of the secondary workspace contains the resources from the organisation chart, structured with the same hierarchy. At the top, planned effort can be compared with the sum of the allocated effort for the task selected in the primary workspace.

The right part of the secondary workspace contains the resource workload diagrams. Using drag & drop, the displayed area can be moved both horizontally and vertically when the mouse cursor is in the secondary workspace.

For a detailed explanation of workload charts, the article on WORKLOAD AND ABSENCES view can be viewed.

  • Time Unit: Determines the unit of the time axis of the workload diagram in the secondary workspace. Quarter, month, week and day can be selected.

  • Show: This section determines which information is displayed in the secondary workspace.

    • Only allocated resources: This check box determines whether the displayed resources are limited to those that are already allocated to the selected task.

  • Zoom: This slider sets the row height in the secondary workspace. ​

  • ​​Time Unit: Determines the unit of the time axis of the workload diagram in the secondary workspace. Quarter, month, week and day can be selected.

  • Show: This section determines which information is displayed in the secondary workspace.

    • Resource planning: This list determines whether resource planning is displayed in the secondary workspace.

      • Only allocated resources: This check box determines whether the displayed resources are limited to those that are already allocated to the selected task. Please note that to view all resources assigned to a project, the main task of a project must be selected.

    • Workload: This section determines whether the workload diagram is displayed in the secondary workspace for the resources.

      • Allocations: If this checkbox is enabled, new allocations can be created directly in the secondary workspace. For each resource, an allocation can be created directly in the corresponding row to the task selected in the primary workspace. The possibilities for allocation are the same as those in the Side Tab of the task (F2), as described above.

      • Actuals and Remaining: displays the time recorded on tasks versus the estimated work left for assigned projects and tasks. It shows the actual effort or time spent so far and contrasts it with the system’s estimation of the remaining work needed to complete the projects. Provisionals are automatically calculated by the system when the most recent reporting of actuals is either outdated or missing.

      • Zoom: This slider sets the row height in the secondary workspace.

  • ​​Time Unit: Determines the unit of the time axis of the workload diagram in the secondary workspace. Quarter, month, week and day can be selected.

  • Show: This section determines which information is displayed in the secondary workspace.

    • Resource planning: This list determines whether resource planning is displayed in the secondary workspace.

      • Only allocated resources: This check box determines whether the displayed resources are limited to those that are already allocated to the selected task.

    • Workload: This section determines whether the workload diagram is displayed in the secondary workspace for the resources.

      • Allocations: If this checkbox is enabled, new allocations can be created directly in the secondary workspace. For each resource, an allocation can be created directly in the corresponding row to the task selected in the primary workspace. The possibilities for allocation are the same as those in the Side Tab of the task (F2), as described above.

      • Actuals and Remaining: displays the time recorded on tasks versus the estimated work left for assigned projects and tasks. It shows the actual effort or time spent so far and contrasts it with the system’s estimation of the remaining work needed to complete the projects. Provisionals are automatically calculated by the system when the most recent reporting of actuals is either outdated or missing.

      • Share of the project: If this checkbox is selected, the workload charts in the secondary workspace will be highlighted with purple colour to indicate what portion of the bar is from the active project.

      • Zoom: This slider sets the row height in the secondary workspace.

With the button Move and zoom the Gantt synchronously to the resource planning the primary workspace is synchronized with the secondary workspace. The displayed time ranges and zoom factors are aligned so that when the displayed time range of the resource planning is moved, the Gantt chart is also moved and when the scaling of the resource planning is changed, the scaling of the Gantt chart is also adjusted accordingly.
The Go to today button centres the displayed area on today's date.

TODOs

Extends the view with options for TODO planning.

  • Show Kanban View: Opens the Kanban board in the secondary workspace, providing the capability to schedule TODOs within the project and its tasks. The first row on this Kanban board corresponds to the selected item in the primary workspace, while the second row displays all TODOs linked to the entire project.

  • Show List View: Opens the list view in the secondary workspace, which allows scheduling of TODOs in the project and its tasks.

  • Closed TODOs: Filters whether and which completed TODOs are displayed in the workspace.

  • Show: These checkboxes can be used to determine which information is displayed in the secondary workspace.

    • Sub-Tasks: If this checkbox is active, all TODOs that originate from all subtasks of the task selected in the primary workspace will also be displayed in the secondary workspace. In the Kanban board, these are displayed in an additional line.

    • Properties*: Contains attributes from the TODO tab in the Side Tab for a TODO and for comments or markers. This checkbox is only available when the list view is enabled.

    • Relations*: Contains the relations a TODO can have to other objects in PQFORCE. This checkbox is only available when the list view is enabled.

The checkboxes marked with * are only available when List View is enabled.

For a detailed explanation on how to use Kanban board and list view, the TODO view article can be viewed.

VIEW

This section is available only for editions higher than PQFORCE Smart

The features of this section may differ depending on your PQFORCE edition.

Working time model: Clicking on this icon opens a menu where it is possible to choose the most suitable model for the current project.

Two options are available when selecting a working time model.

  • Calendar week: The system will consider all calendar days when scheduling project tasks

  • Working week: The system will only consider the designated working days when scheduling project tasks. Non-working days, including weekends and bank holidays set in the ADMIN module section HOLIDAY LOCALES, will be visually highlighted in the Gantt chart.

While users may continue to adjust task durations as needed, the system will restrict tasks from being scheduled to start or end on non-working days.

This change also affects the task duration displayed in the Details Side Tab, which will now reflect only the number of working days between a task's start and end dates, in line with the selected working time model.

  • Working time model: Clicking on this icon opens a menu where it is possible to choose the most suitable model for the current project. Two options are available:

    • No working time model: Tasks are scheduled without accounting for weekends or HOLIDAY LOCALES configured in the system.

    • Organisation unit or resource model: A specific working time model is applied, either from an organisation unit or an individual resource. Once selected, only the designated working days are considered when scheduling tasks. Non-working days, including system-configured holidays, are visually highlighted in the Gantt chart. Tasks cannot be set to start or end on non-working days, and any existing task whose start or end date falls on a restricted period is highlighted in red. Task durations can still be adjusted manually, though the duration displayed in the Details Side Tab will reflect only the number of working days between the start and end dates, in line with the selected model.

      For each of the options above, one of the following settings can be applied:

    • Project Default: The selected model is set as the default for all users within the project, ensuring a consistent view across the team.

    • Preferred for me: The selected model is saved as a personal preference, applying only to the current user's view.

  • Currency: Currency for the selected project can be defined here

ACTIONS

Actions for the active view can be performed here.

Export: Here the currently displayed project list GANTT can be exported.

↑